LVfan
Member
Work is continuing rapidly on the Athletics’ $2 billion Las Vegas ballpark, with two of four main levels of the stadium now stretching around the project’s 9-acre footprint.
The deck of the ballpark’s lower concourse has been poured from the foul pole on the third base line, with the pour starting Wednesday on a portion in right field, according to A’s president Marc Badain.
https://www.reviewjournal.com/sport...gress-of-strip-ballpark-construction-3619105/